A practical starting point for roofing crews, project managers and building owners.
Review the five loading requirements and photo examples before preparing insulation boards for collection.
Read practical articles on roof insulation recycling, planning and trailer loading.
Explore the six steps from project planning through material recycling.
Review qualifying polyiso, EPS, XPS and roofing membrane materials.
Understand the potential value of waste diversion and material recycling.
Collection and loading requirements vary by material, project location and site conditions. Contact Disposal Alternatives for instructions specific to your project before removal or loading begins.
Talk with us before the tear-off begins so material eligibility, handling and collection can be coordinated.
© Disposal Alternatives